Wayfarer Cafe, DIFC (ongoing)
Café fit-out in DIFC, Dubai
Wayfarer Cafe, Café fit-out, DIFC
An ongoing café fit-out in DIFC: strip-out of the existing floor and stone finishes, debris bagged and trucked away, floor protection, scaffold for ceiling works, main DB panels, fluted wall panelling and new doors.
- Sector
- Café fit-out
- Location
- DIFC, Dubai
- Client
- Wayfarer Cafe
- Status
- In progress

Scope
- Strip-out & demolition
- Debris removal
- Floor protection
- Scaffold for ceiling works
- Main DB & electrical panels
- Fluted wall panelling
- New doors
The project
How it came together.
Wayfarer Cafe in DIFC is an ongoing Moonwest fit-out. Everything below is straight from site, sorted by stage.
The existing floor and stone finishes were stripped out and broken up. The debris was bagged and taken away by truck, and floor protection went down across the space.
Scaffold towers are up for the ceiling works, the main DB and electrical panels are being wired, and the fluted wall panelling and new doors are going in.
The fit-out is in progress. Finished photos follow at handover.
On site
Clips from site.

Strip-out: debris bagged for removal

Floor protection going down

Fit-out in progress

Main DB wiring
Gallery
Stage by stage.
01 Strip-out

Moonwest workers breaking out the existing floor at Wayfarer Cafe, DIFC 
Wide view of the Wayfarer Cafe strip-out in DIFC, with breakers lifting the existing floor 
Broken-out stone finishes piled for removal at Wayfarer Cafe, DIFC 
Lifted red stone floor tiles during the Wayfarer Cafe strip-out 
Truck loaded with bagged strip-out debris from Wayfarer Cafe 
Strip-out debris bagged for removal at Wayfarer Cafe, DIFC 
Bagged debris from the Wayfarer Cafe strip-out loaded on a truck for removal (plate blurred) 
Debris from the stone and floor strip-out at Wayfarer Cafe 
Stone rubble from the strip-out, with floor protection laid alongside 
Scaffold tower by an arched opening during strip-out at Wayfarer Cafe 
Bagged debris across the stripped dining area at Wayfarer Cafe 
Bagged debris and stripped floor along the Wayfarer Cafe corridor 
Wall stripped back during the Wayfarer Cafe strip-out 
Dining area stripped back at Wayfarer Cafe, DIFC
02 During works

Scaffold tower beside the fluted wall panelling for ceiling works at Wayfarer Cafe 
Panels stacked on floor protection during the Wayfarer Cafe fit-out 
Scaffold tower set up for ceiling works at Wayfarer Cafe, DIFC 
Scaffold up to the open ceiling during works at Wayfarer Cafe 
Moonwest worker on a scaffold during the Wayfarer Cafe fit-out 
Boxed materials delivered to site at Wayfarer Cafe, DIFC 
Kitchen equipment and counters protected during works at Wayfarer Cafe 
Open kitchen with stainless hood at Wayfarer Cafe during works 
Panels and materials laid out on floor protection at Wayfarer Cafe 
Kitchen line and stair at Wayfarer Cafe during the fit-out 
Kitchen equipment moved on floor protection during works at Wayfarer Cafe
03 MEP

Main DB panels open for electrical works at Wayfarer Cafe, DIFC 
Electrical panel being wired at Wayfarer Cafe, DIFC 
Cable bundles pulled for the new electrical installation at Wayfarer Cafe 
Open ceiling services above the Wayfarer Cafe fit-out 
Cable coils ready to pull beside the fluted wall at Wayfarer Cafe 
Cables run along a tray during the Wayfarer Cafe electrical works 
Moonwest electrician working in the ceiling cable tray at Wayfarer Cafe 
Cable coils on site for the Wayfarer Cafe electrical works 
Cable tray and cabling in the open ceiling at Wayfarer Cafe 
Electrical accessories being wired at Wayfarer Cafe, DIFC 
Cables pulled down from the ceiling to the main DB beside the fluted wall at Wayfarer Cafe
04 Finishes

Fluted wall panelling and a new door at Wayfarer Cafe, DIFC, with floor protection down