TODATheatre of Digital Art, Souk Madinat Jumeirah
An open hall at Souk Madinat Jumeirah turned into TODA, the Theatre of Digital Art: steel frames cut on site, LED structures wired in, then floors, joinery and lighting.
- Programme
- 2.5 months
- From
- Open hall
- To
- Full handover
- Relationship
- 2 years with the TODA team


The project
How it came together.
- Steel frames cut on site
- LED structures wired in
- AV and lighting integration
- Floors
- Joinery
- MEP
TODA needed a hall that could carry light as architecture. We took it from an open shell to full handover in two and a half months.
Steel frames were cut and fixed on site, the LED structures were wired in, and the floors, joinery and lighting were finished around them, with fit-out and MEP run by one team.
We have worked with the TODA team for two years.
On site
From frame to finish.

01 · Washroom, during works

02 · Washroom, handed over

03 · Hall, LED install

04 · Hall, handed over

Washroom vanity, before and after

LED columns, scaffold to finish

The bar

Arched lounge

Wave room
Stage works
The theatre stage, during and after.
The theatre hall at TODA, from works in progress on the stage floor to the finished room under the wave projections. Stills and clips are from our own site filming, before and after handover.

01 · Stage, during works

02 · Stage floor, finishing

03 · Floor panels going in

04 · Stage, handed over

05 · Seating, handed over

06 · Projection wall, live

Stage, during works

Stage, handed over

Stage and projections

Tiered seating

Projection wall

Control desk